Wellcome to National Portal
Main Comtent Skiped

Achievements

 

KWASA Achievements- a brief description
Working Area Status of 2009 Status of 2018

Daily Water Production

96 MLD

119.50 MLD (24.50% increment)

Non Revenue Water

37% 24%

Billing System

Manual Computerized

Revenue Collection Ratio

78%

95%

Nos. of Production Tube wells

60 88

Water Connection

12245

19312 (57.71% increment)

Metered Household Connection

0.00%

58%

Pipeline Laying

227 Km

290.50 Km (27.97% increment)